Improving Procurement in India's Technical Education Project through the Web

Kalesh Kumar's picture

In 2006-07, a procurement review carried out on the Technical Education Quality Improvement Project (TEQIP) in India shocked and surprised project authorities as well as the World Bank. Even in the third year of implementation, participating Engineering institutes were unable to follow the agreed processes and procedures. That situation eventually lead to the development of web based PMSS (Procurement management Support System) currently being used in TEQIP Phase 2 program.

The procurement Review Consultants reported an astonishing 56% variation and resulting non compliance of procedures in the sample of reviewed contracts. A series of further assessments and introspection brought out the main issues that plagued the procurement system. These were:

(i) Geography: challenges of ensuring consistency and adherence to agreed procedures in projects that covered a wide area between hundreds of institutions as seen institutions in different states following their respective procedures , using inappropriate methods of selection, etc. 

How do Projects Implemented by Beneficiary Communities Save Time and Costs?

Kalesh Kumar's picture

In 2010, under the nationwide Elementary Education Program called Sarva Siksha Abhiyan (SSA), an education committee in Bhagwan Garhi in the Aligarh district of Uttar Pradesh, India completed the construction of an eight classroom school for the cost of $80 per square meter, whereas the cost incurred for a contractor lead construction of a comparable school structure in the nearby district of Lucknow was $124 per square meter.

According to review reports, the Community Beneficiary Committee in Bhagwan Garhi had completed the work drawing labor from the community and buying the required amount of materials at a lower rate with technical guidance from the district level engineer.

How does this happen?