As population and income rise, car and motorcycle ownership quickly increased in both megacities while mass transit is not developing fast enough, with serious consequences on traffic congestion, accidents and pollution. São Paulo has 150km+ traffic queues daily and losses of productivity, wasted fuel, health impacts and accidents estimated at around 2% of Brazil’s GDP in 2013, with three fatal deaths daily in motorcycle accidents alone. Mumbai, in addition to all-day road traffic jams, have an astounding six deaths daily from riders hanging and falling from packed trains which circulate with open doors to avoid reducing carrying capacity. The city comes to a standstill when the rail right-of-way is flooded by heavy monsoon rains.
Access to jobs and basic services in both mega-cities is extremely difficult – particularly for the poor, who often live far from major employment centers. The two cities need to act quickly and take drastic measures to improve mobility and access... But this is easier said than done: expanding the transport infrastructure in these megacities requires careful planning, massive investment, and may also involve relocating large numbers of people and businesses.
Both MMR and SPMR are blessed with extensive suburban railway networks that were built originally for freight and intercity passengers and are now major commuter networks used by millions of passengers every day. Some of those suburban lines are being upgraded and aim at providing a level of service comparable to a metro. Conversion of suburban lines makes sense if it is coupled with urban renewal around key stations through adequate transit oriented development (TOD) plans, but needs urgently to be complemented by many more kilometers of exclusive mass transit corridors such as metros (underground and elevated) and BRT (bus rapid transit) as in Santiago de Chile. This is not happening fast enough in São Paulo and Mumbai.
So, why were the three levels of government (municipal, state and federal) so slow in coordinating mass transit programs to respond to the growth of their megacities? Why Mumbai unlike Delhi which started in 2002 and has 194 km of metro, waited until now to start operations on its first metro and monorail lines when population and congestion grew at such a relentless rate? Why São Paulo has only 70 kilometers of subway while other BRIC megacities like Shanghai, opened in 1993 has 538 km and Beijing in 1971 has 465 km?
São Paulo, Mumbai and other megacities of the BRICs facing similar mobility challenges must focus on three key aspects:
- Building strong urban transport governance: the first problem is the absence of a Metropolitan Transport authority representing the three levels of government within the metropolitan region, and responsible for coordinating and implementing a long-term integrated urban transport, land use and air quality plan. This is what civil society and financiers should jointly push for - but this will only happen if they first realize how much is wasted due to lack of coordination of governments.
- Getting the financing mechanisms right: another priority is to ensure the long term plan mentioned above provides a roadmap and implementation schedule for BRT and metrorail corridors coupled with demand management measures, and provides mechanisms to secure steady financing without major disruptions. National governments must understand that decentralization of urban transport services does not mean they should not participate in the financing of major projects. Either they have a mobility law which specifies how they can contribute to urban transport of the mega metropolitan regions (as in Delhi, India but not in Brazil) or they should provide taxation mechanisms whose revenue can be earmarked for urban transport (e.g. fuel taxes, in Colombia or versement transport in France). Making sure that national financing is neutral and not driven by party politics is also critical.
- Shovel-ready projects, political and technical leadership: but even when funds are available - as they are now in Brazil and India, mega metropolitan regions are taking much longer than planned to implement their mass transit projects because: a) they lack an inventory of shovel-ready projects with complete safeguards analysis and basic engineering design. This often delays the decision-making process of incoming administrations which may be tempted by solutions that are controversial and not necessarily cost-efficient (e.g Mumbai’s monorail); and b) the lack of recognized champions and strong managers to steadily steer implementation through the many political and engineering hurdles faced in mass transit works. I have seen this in both São Paulo and Mumbai suburban rail and in many other countries. Authorities must ensure there is a charismatic leader associated with major projects (e.g Delhi Metro or Bogotá BRT) and either train or hire solid project managers capable of dealing adequately with contractors that often do not comply with schedules and standards.
Learn more:
- Google Book: São Paulo and Mumbai: the Impact of Rail-based Networks on Two BRIC Megacities by Jorge Rebelo
- Google Book: Essentials for Sustainable Urban Transport in Brazil's Large Metropolitan Areas by Jorge Rebelo
- Projects & Operations: Mumbai Urban Transport Project-2A
- Results: Improving the Quality of Travel in Mumbai, India’s Commercial and Financial Capital
- Video: Moving Mumbai into the Future
- Projects & Operations: São Paulo Trains and Signaling (additional financing)
- Projects & Operations: São Paulo Metro Line 5
- Projects & Operations: São Paulo Metro Line 4 (phase 2)
Join the Conversation